COMPLIANCE. GOVERNANCE. CHECKED.
Managed. And checked.
Your managers run the building. We check its compliance and governance from the records: contracts, certificates and deadlines. Your owners corporation hears early, while there is time to act.
From $599 + GST a month. $658.90 in total.
- The comprehensive package
- One fixed monthly fee
- Paid by the owners corporation
- Zero commissions
EVER.
THE TRUTH ABOUT STRATA
Your building is a business. Run by volunteers. On a Tuesday night.
What lands on the committee’s table
- Lift contract
- Fire safety report
- Air conditioning (HVAC)
- Insurance valuation
- Security
- Insurance renewal
- Building manager’s contract
- Strata manager’s contract
- Maintenance plan
- As-built drawings
- Defects
- The AGM
Autopilot is expensive.
Certificates lapse. Contracts renew themselves. Records leave with the last committee. Your committee signed up to help their neighbours, not to chase all that.
It’s managed. But who’s checking?
We are.
Reeve Whitby is the independent consultant in your committee’s corner. We don’t run your building. We check how it’s run, and good work gets the credit.
Managed, and checked.
WHAT WE LOOK AT
Compliance. Governance. Checked.
Two questions sit behind every well-run building. We report on both from the records, on one page.
COMPLIANCE
Is the building doing what it must?
- This year’s safety measures report, on file and in date
- Certificates in date: lifts, pool barriers, cooling towers, roof anchors
- Insurance current, with a recent valuation on file
- A licence and an insurance certificate on file for each contractor
- Notices and orders, each with a record of the answer
GOVERNANCE
Is it run the way it should be?
- Meetings held and minuted, with actions followed up
- Records complete, and easy to find
- Contracts signed, current and fairly tendered
- Commissions and conflicts declared in writing
- The maintenance plan in place, funded and followed
We check the records. We do not inspect or certify, we do not say whether a building complies with the law, and we do not give legal advice. The licensed people who do that work stay responsible for it.
THE TWO-MINUTE CHECK
Six questions. Can your committee answer them?
Tap an answer for each one. Nothing is sent or saved.
- Do you hold your occupancy permit and as-built drawings?
- Is this year’s fire safety report on file?
- Was the building valued for insurance in the last five years?
- Is your maintenance plan current and funded?
- Do you know the notice date on your biggest contract?
- Could a new committee find all the records in one place?
WHAT WE WATCH
Six things that slip. We look for each one.
None of this is anyone’s fault. Busy people miss things. Our job is to look.
- Watched The silent renewal A contract quietly renews itself at last year’s price. We flag each notice date on the contract map 90 days ahead.
- Watched The no-show A job on the schedule that never happened. We check what was done against the contract.
- Watched The one-quote wonder One quote, from the usual contractor. We set the rules for a fair tender and compare every bid.
- Watched The missing drawings The as-built drawings never left the developer. We ask for every record on the list on day one, and chase what is missing.
- Watched The sneak-up A safety report, certificate or insurance date that arrives overnight. We keep the compliance dates on one live calendar.
- Watched The clean slate A new committee, and the history walks out the door. We keep the record, so nobody starts from zero.
HOW WE WORK
Map it. Check it. Then step in.
A set method, the same for every building. Your managers keep managing. Your committee keeps deciding.
- 01MONTH ONE Map We ask for your building’s records and read each one we receive: the plan, the permits, the drawings, the manuals and the contracts. You get: the records register, the contract map and the compliance calendar.
- 02ON SCHEDULE Check We check what is on file, what was promised against what was done, and what falls due next. You get: the one-page Reeve Report.
- 03BEFORE A DECISION Step in Renewals, tenders, a change of manager. We bring the facts, the options and the questions. Your committee decides. You get: a fair process, in writing.
DAY ONE · THE RECORDS CHECKLIST
First, we ask for the papers.
The day you appoint us, your managers get one list of records, in six groups. We ask for all of each one: every year and every log, not a sample. What cannot be found goes on the list too, with who to ask. A missing record is a finding, not a failure.
- The building Plan of subdivision · Permits and approved plans · Occupancy permit · As-built drawings · Building contract and warranties · Building manual, as handed over by the developer · Resident manual and forms (key order, amenity booking etc.)
- Safety Essential safety measures schedule · This year’s safety report · All fire logbooks · Lift registration · Pool barrier certificate · Cooling tower risk plan · Roof anchor certificates
- Risk and insurance Insurance policy · Insurance valuation · Liability cover · Full claims history · Asbestos register · Cladding assessment · Notices and orders
- Money Budget and fees · All financial statements · The independent report · Maintenance plan · Maintenance fund · Arrears total · Tax records
- Governance Rules · The register · All meeting minutes · Resolutions · Manager’s appointment · Declarations · Complaints register
- Contracts and assets Every service contract · Caretaker agreement · Leases and licences · Network agreements · Contractor insurance · Asset register · All maintenance logs
Names differ from state to state, and not every record applies to every building. We take no copy of your owner list.
YOUR FIRST 30 DAYS
Proof inside a month.
You should not have to wait a year to know if we are worth it. Day ten and day thirty count from the day your records reach us.
- DAY ONEYou say go.You sign one letter. We send it to your managers with the records checklist. That is all you do.
- BY DAY TENRegisters and calendar.What is on file, what is missing, and the dates we find. Each one flagged 90 days ahead.
- BY DAY THIRTYFirst Reeve Report.Compliance, governance and contracts on one page.
No lock-in. Stop at the end of any month, and the registers are yours to keep.
WHAT LANDS ON YOUR TABLE
One page.
Each time.
The Reeve Report shows your committee where the building stands: what is on file, what is due and what we raised. Plain words. Fewer surprises at the AGM.
- The records register: what is on file, what is missing and what is out of date
- The compliance calendar: each date flagged 90 days ahead
- The contract map: the key terms, dates and deliverables
- The declarations page: commissions, rebates and related-party links, put in writing
- Contractor checks: licence, insurance and company record
- One line your committee can pass to every owner
- Handover notes for the next committee
- The Reeve Checked mark for your notice board
ADDITIONAL SERVICES
Want a closer look?
For any maintenance service, such as fire safety, lifts or air conditioning, we can add a monthly service review. We read its service reports and logbooks in full, and follow each defect raised until it is closed. The licensed contractor still does the testing. Each review is priced in your proposal, and added only if your committee asks.
Ask about a service review- Records33 ON FILEFive are missing, the as-built drawings among them. Each has been asked for.
- Fire safety reportDUE IN 35 DAYSThis year’s report on the essential safety measures. The date is on the calendar.
- Insurance valuationOUT OF DATELast valued six years ago. A new valuation is now booked.
- Lift contractDECISION DUENotice date in 59 days. Three options are with the committee.
- Air conditioning (HVAC)IN ORDERServiced on time. The service report is on file.
- MeetingsIN ORDERAnnual general meeting held on time. Minutes issued in 9 days.
SEE IT BEFORE YOU DECIDE
Four samples. One page each.
This is what lands on your committee’s table. Every name and figure in the samples is invented.
-
ON DAY ONEThe records checklistEvery record we ask for, and what came back.Open the full page
-
MONTH ONEThe contract mapEach contract, with its cost and notice date.Open the full page
-
ON SCHEDULEThe Reeve ReportRecords, dates and contracts on one page.Open the full page
-
90 DAYS BEFORE A RENEWALThe options paperThe facts, your options, the questions to ask.Open the full page
THE BUILDING FILE
Committees change. The file stays.
Every building we look after gets its own file: every record, contract, date, report and decision in one place. A new committee starts with the whole history, not a blank page.
- Software reads the records, page by page.
- A consultant checks each report against its sources before it reaches you.
- Ask us anything about your building’s papers. We answer from the file.
That is how one fixed fee covers the records of the whole building.
- Records33 on file, 5 missing
- Contracts14 on the map
- Dates tracked27
- Papers received6 months
- Reeve Reports3 sent
- Decisions9 sets of minutes
THE FAIR TENDER STANDARD
Six rules for every tender.
Simple, public, and the same for every contractor. Any committee can adopt it by resolution.
- One written scopeEvery bidder prices the same job.
- At least three bidsInvited openly, from capable contractors.
- One due dateNobody sees another bid first.
- Conflicts declaredEvery link and commission, in writing.
- Side by sideOne page that compares like with like.
- Your committee decidesWe advise. You choose.
THE HONEST BIT
We do not promise savings. We promise a second look.
Every record, date and contract we are given gets an independent second look. Then your committee decides, with the facts in front of it.
- 90days’ warning before each date on your calendar
- 6groups of records asked for on day one
- 1page. The Reeve Report, every time.
- 0commissions. From anyone. Ever.
PRICING
One fee. The whole package.
One comprehensive package for every building, on one fixed monthly fee. Additional services are optional, and added only if your committee asks.
- UP TO 150 LOTS$599+ GST a month$658.90 with GST
- OVER 150 LOTS$899+ GST a month$988.90 with GST
The comprehensive package
The same for every building.
- The records checklist: every record asked for, tracked and chased
- The compliance calendar: reports, certificates and renewals, each flagged 90 days ahead
- The contract map: each contract we are given, with its cost and notice date
- The Reeve Report: compliance, governance and contracts on one page
- An options paper before each renewal and notice date on the map
- Fair tender rules, and every bid compared side by side
- Contractor checks: licence, insurance and company record
- The declarations page: commissions, rebates and related-party links, in writing
- The Building File, handed to each new committee
- Paid by the owners corporation
- No set-up or per-job fees
- Zero commissions, from anyone
First buildings. Join before 1 June and your fee is held for two years.
See a sample fee proposalAll prices are plus GST. The amount with GST is shown under each price.
FOR STRATA AND BUILDING MANAGERS
Good work, on the record.
We are not here to replace you. We put your good work on the record, and keep the process fair when contracts come up.
- Questions come to you firstIn writing, through one channel. Your answer goes in the report beside each question.
- We never compete with youWe do not manage buildings, and we take no commissions or referral fees, from anyone.
- A fair hearingOpen tenders. Every manager who bids gets the same written scope and the same due date.
Go first. Tell your committees you welcome independent checking. It is the simplest way to show your work stands up.
ASKED OFTEN
Straight answers.
We already have a building manager and a strata manager. Why would we need you?
They run the building and the administration. Usually nobody is engaged to check, independently, that the records are complete, the certificates are in date and each job was done. That is the gap we fill, and we report only to the owners corporation.
Do you replace our managers?
No. We work alongside them. We expect most reports to confirm good work. When we find a gap, the committee hears about it early, with the facts.
Will our strata manager mind?
Good managers welcome a second look. Our questions go to them first, in writing, and their answers go in the report. We do not manage buildings, so we never compete with them for yours.
Do you inspect the building?
No. We work from the papers: the contracts, service reports, minutes and invoices your managers send us. When the papers and the contract do not match, we ask the question and report the answer.
Do you certify that our building complies?
No. We check that the right records, certificates and reports are on file and in date, and we tell you what is missing or due. Inspecting and certifying stay with the licensed people who do that work.
How often do you report?
The schedule is set in your agreement. Dates do not wait for a report: you hear from us 90 days before each date on your calendar.
Who pays, and are there other fees?
The owners corporation pays one fixed monthly fee: $599 plus GST for buildings up to 150 lots, and $899 plus GST for larger ones. No set-up fee, no per-job fees, and we take no commissions from anyone. Additional services, such as a monthly review of one maintenance service, are quoted in your proposal and added only if your committee asks.
What if we want to change manager?
We help the committee set the scope, go to market and compare proposals fairly. The committee and the owners corporation make the decision.
Is this legal advice?
No. We give commercial guidance: what your records show, what is missing or due, and which questions to ask. Where you need a lawyer, we say so.
Who can rely on your reports?
The owners corporation that engages us. Our reports are written for your committee, from the records we are given. They are not written for buyers, lenders or insurers.
How can we check your work?
Every line in a Reeve Report is traced to the record it came from. Ask, and we show you the page. The registers and the Building File stay yours, even if you stop.
What if a report gets something wrong?
Tell us. We check the line against its source. If it is wrong, we send a corrected report and note the change on the file.
Do you use software to read the records?
Yes. Software reads the records and drafts the registers and each report. A consultant checks each report against its sources before it reaches you. That is how one fixed fee can cover the records of the whole building.
How do we begin?
Invite us to a committee meeting. Fifteen minutes, in person or online, at no charge. If the committee says go, your registers arrive within 10 days of the records reaching us, and your first Reeve Report within 30.
TALK TO US
Just 15 minutes.
We’ll show you where to look.
Tell us about your building. We’ll come to your next committee meeting, in person or online. No charge, no hard sell.
WHAT HAPPENS NEXT
- We reply to arrange a time.
- Fifteen minutes with your committee, in person or online.
- Your committee decides. No obligation.
Thank you.
Your enquiry is with us. We will be in touch to arrange a time.
Enquiry received
